WORK PARTIES CALENDAR

Come and join us to build and maintain the Grand Valley Trail! 

Work parties are scheduled as per the list below. Please check the location of the party and the skills required. If you can contribute and want to join the party, please register. Please do not join a party without registering first. Make sure to bring good footwear and, if you have your own, safety glasses and gloves.

Upcoming Work Parties

    • 19 Oct 2026
    • 9:00 AM
    • 23 Oct 2026
    • 3:00 PM
    • add area
    • 19
    Register

    Work Party coordinator: Dave Martin
    Contact:  pinetreedavid@cogeco.ca  or  905-517-1956

    Meet Location:   Big Creek Rd (nearby road number 370).     

           GPS:  43.113127, -80.045685
           Google Maps: https://maps.app.goo.gl/9xWKhpQ8mEr8QToi6

    About this work party

    To help move bridge out of the way (2 people required) and re-blaze. Any morning October 19 to Oct 23. Time and date to be arranged with trail director.

          NOTE: The GVTA web-site shows the work party as NOV. 19. Register for this date and coordinate with Dave to arrange an actual time and date.

    When:  November 19 to 23, 2026 - coordinate a date with Dave at:  pinetreedavid@cogeco.ca

    Time:   9:00 AM – or coordinate a time with Dave.

    Tools Required (if available): None

    Dress:  - Work clothes appropriate for the weather.

    Registration and Work Party Waiver:
    Please register using the 'Register' button on the left of the registration screen at GVTA website:    https://www.gvta.on.ca/Work-Parties-Calendar

     Registering automatically provides your waiver acceptance.

     



    • 7 Nov 2026
    • 9:00 AM - 12:00 PM
    • York
    • 18
    Register

    Work Party Coordinator: Paul Personic
    Contact: 
    paul.personnic@rogers.com    or   647-234-7908
    When: 
    November 7, 2026
    Time:   
    9:00 AM
    Meet Location:   
    41 Front St, York (Free parking at York Park)
    Google Maps:   
    41 Front St S

    About the Work Party:   
     
    - Install metal blazes on hydro poles along River Road as directed by work-party leader.
     -
    Paint blazes on trees, wooden posts etc. with land owner permission, if/when necessary. This should be infrequent if, at all. Work-party leaders will decide if this is necessary.
        Note:
    Spacing between blazes is approximately 1 km or, whenever line-of-sight is blocked by curves, trees, hills etc. Guidance will be provided by the work-party leader.
     
     - After a blaze is placed on a hydro pole, a picture of the pole number must be recorded by the work-party leader for entry into the Hydro One data base.
     
     - Install GVTA signs on Trans-Canada Trail metal sign trail posts.
     
    Tools Required (if available):
    If you have or can borrow it, bring a battery drill with batteries and ‘red’ and ‘green’ Robinson bits.

    Optional Tools:
    a)  Cut-out blaze (2” x 6”) on a cardboard template
    b)  2” (angle) paint brush …rags and, gloves recommended
    c)  Scrapper, pruners (in case of plant growth in designated spot)

     
    Provided Material: 
    Metal blazes, screws/bolts and GVTA signs and paint is all provided.

    Dress: 
    - Work clothes appropriate for the weather. 
                 - Work boots and coloured vest are recommended because work is close to the road.


    Registration and Work Party Waiver:
    Please register using the 'Register' button on the left of the registration screen at GVTA website:
    https://www.gvta.on.ca/Work-Parties-Calendar


    Registering automatically provides your waiver acceptance. 



Powered by Wild Apricot Membership Software