Meet Location: Meet at end of Fen Ridge Court,
south of Hwy 403 off Oak Park Road
Google Maps: (43.164309 -80.344014)
About the Work Party: Widen, strengthen and install
double handrails on 35 foot bridge.
Tools needed: Battery screw guns, tape measure, level, gloves and boots.
Remaining tools are supplied.
Material: Building material will be delivered to the 403 highway bridge
close to the site and moved to the site from there. We will carry
only our tools from our cars to site, about 1 km - all downhill !
Work Party Coordinator: Tony Kelly
Email: tkelly1943@gmail.com
Phone: 416-712-5399
Registration and Work Party Waiver:
Please register using the 'Register' button on the left.